• Procedure
  • Hsin-chu Site
  • Metrology Analysis Service
  • High Frequency Technology
  • Tainan Site
* Contact Information

Northern region: Ms. Xiu-fang Jian TEL: (03)5726100-7610
Southern region: Ms. Ling-ru Zhou TEL: (06)5050650-6632

* Charge for self-operation processes

Academia: 90% discount
Industrials: Foundry service only

Before operating NDL equipment, students are requested to take training and pass certification and receive relevant equipment training. Only those who pass training can operate NDL equipment independently.

此頁空白

此頁空白

* Regulations for self-measurement
  1. When booking a machine, please select sessions in the evening. NDL engineers have priority to use NDL equipment during the day time.
  2. When booking daytime sessions, applicants should complete the takeover with engineers at NDL on the booking day.
  3. Applicants booking evening sessions should complete the handover with engineers at NDL by 17:00 on the booking day.
  4. Applicants booking holiday sessions should complete the handover with engineers at NDL by 17:00 on one workday before.
  5. Please use equipment at exact time. Tardiness or unexcused absences are unacceptable.
  6. Students must pass the “Equipment Operation Evaluation” before they are allowed to operate instruments/equipment.
  7. Do not move any instruments/equipment. Contact the instrument/ equipment responsible person before doing so.
  8. Make sure to sign out the system with the keycard and complete the “Equipment Use Record” each time after use.
  9. Use only the measuring parts (e.g. adaptor) provided by NDL. Inform the instrument/equipment responsible person before using private parts.
  10. When adapting a SMA connector, use a 5 psi torque wrench.
  11. Violation of the above rules will be punished with reference to the NDL Equipment Violation Management Directions.

此頁空白